The #1 Miami Real Estate Website

The Crosby Miami Worldcenter Receives Construction Permit

August 18, 2023 by Jacki Taylor

The Crosby Miami Worldcenter




The Crosby Miami Worldcenter, a future 33-story mixed-use building situated within Miami Worldcenter at 601 North Miami Avenue in downtown Miami, has recently received a construction permit from Miami's Building Department. The 376-foot-tall building will include 450 units that can accommodate short-term rentals, more than 22,000 square feet of amenities, and 3,370 square feet of retail space.





Designed by Cohen Freedman Encinosa & Associates Architects, with interiors imagined by Avro|KO, and developed by DT G Block LLC, a joint venture between Related Group and Merrimac Ventures.





The vertical construction permit was issued on August 7th and states the anticipated gross square footage is 394,240. The construction expenses are around $68.4 million.





Residence Sizes





  • studios ranging from 300 to 400 square feet
  • 1-bedroom units with sizes of 600 to 650 square feet
  • 2-bedroom layouts covering around 825 square feet




Residence Features:





  • Avro|KO-curated furniture
  • 9-foot-tall ceilings with floor-to-ceiling glass windows
  • balcony with each residence
  • finished interior and exterior flooring
  • gourmet kitchens with custom Italian cabinetry
  • Bosch appliances including paneled refrigerator/freezer
  • dishwasher
  • built-in convection oven/microwave
  • cooktop
  • rain showers in primary bathrooms
  • custom Italian vanities
  • full-sized washer and dryer in the unit
  • contemporary lighting packages
  • smart-home systems with touchless controls including a smart keyless entry system accessible via smart app, door code, keycard, or Apple Watch




Building Amenities:





  • rooftop pool
  • Jacuzzi
  • cabanas
  • private restaurant/bar
  • fire pit lounge
  • fitness center with saunas/plunge pools
  • clubroom with private dining
  • co-working center
  • gaming lounge
  • media room
  • curated art
  • Security services and concierge assistance are available 24/7




Top-off and construction completion is expected in early 2025.





The Crosby Miami Worldcenter Lobby

0 0 votes
Article Rating
Subscribe
Notify of
0 Comments
oldest
newest most voted
Inline Feedbacks
View all comments

For Real Estate
Related Needs And Inquiries

please complete the form below

  • This field is for validation purposes and should be left unchanged.