New Construction Tower-Ambienta Bay Harbor Islands Plans Ground Breaking for June 2021
May 11, 2021
by: Jacki Taylor
Ambienta Bay Harbor Islands is one of the newest condo developments in Bay Harbor Islands. Located at 9901 West Bay Harbor Drive, this 7 story and 30-unit building will feature quality craftsmanship, high-end materials, and flawless finishes that is truly awe-inspiring.
Although limited to 30 units, this tower will showcase two bedroom + den to three bedroom units ranging from 1,229 to 1,662 square feel. Upon entering the building, you will be greeted with a double-height lobby, glass façade throughout, and gorgeous gardens with tropical plants. Each unit will includes its own two parking spaces and a storage unit. The prices for these units will range from $761,000 to $1.2 million.
Construction Information:
Developer: Ambienta Developers
Architect: Revuelta Architecture International
Landscape Design: David J. Odishoo
Interior Design: Bea Interiors Design
Building Features:
360-degree Rooftop Oasis for outdoor enjoyment
Infinity-edge swimming pool
Outdoor yoga/meditation space
Children’s play area
Fully outfitted Fitness Center with cardio and weight training equipment
Resident’s social room with bar, large-screen televisions, and lounge seating perfect for events or meetings of any kind
Impressive double-height lobby with reception seating
Residence Amenities:
Two covered parking spaces per residence
Corner residences offer wrap-around terraces
High impact floor-to-ceiling sliding glass doors and windows
All bedrooms have access to expansive balconies
Walk-in closets in master bedrooms
Master bathroom with double sink, glass shower enclosure with rainfall shower head and hand shower
Expansive glass-framed outdoor terraces accessible from bedrooms and living areas
Italian kitchens with custom quartz counter tops and Italkraft® cabinetry
Bosch® appliance suite includes induction cooktop, built-in stainless steel French door refrigerator, convection oven, microwave oven, and dishwasher
Private storage available on same level as residence
Bluetooth® enabled keyless entry system with camera technology
Sales have already started on this development and it is expected to break ground in June with a top-off date of July 2022. Closings are set to begin in spring of 2023.
Leave a Reply